Net Metering Calculator Pakistan

Your units in, your units out, and what the DISCO bills you under the 2026 net-billing rules or the old net metering. Reviewed 6 October 2026.

Billing regime
DISCO
Every DISCO and K-Electric charge the same residential tariff; the pick labels your result.
Imported units
Exported units
Sanctioned load
Sets the fixed charge per kW. Your solar system may not exceed this (reg. 4(2)).
Export rate (net billing)
NEPRA CY2026 energy charge per unit bought
Tax status

Your net bill this month

PKR 17,032

LESCO · 400 in, 500 out

An estimate on the S.R.O. 279(I)/2026 tariff with this month's adjustments. The export rate is the reader's pick, because NEPRA has not notified one.

Import charge, 400 units with taxes21,097
Export credit, 500 × Rs 8.13−4,065
Net bill17,032
Same month under old net metering1,658
Difference between the two regimes15,374

Estimate from the published tariff; your DISCO's bill is the figure that counts.

What changed on 9 February 2026

NEPRA's Prosumer Regulations 2026 (SRO 251(I)/2026) came into force that day and repealed the 2015 Net Metering Regulations. Under the old rules the meter netted units one for one: 500 units out cancelled 500 units in, whatever each was worth. Under net billing the two flows are settled separately. Regulation 14 bills every imported unit at your normal slab tariff, with FCA, QTA, duty and GST on top, and credits every exported unit at the national average energy purchase price. If the credit is bigger than the bill, the difference carries to next month or is paid quarterly.

Three more things changed. The agreement now runs 5 years from commissioning, renewable 5 at a time, where the old ones were 7. The system may not be larger than your sanctioned load. And NEPRA charges a one-time concurrence fee of Rs 1,000 per kW (Schedule-IV), so PKR 5,000 on a 5 kW system; since the August 2026 amendment (reported as SRO 1320(I)/2026, in some places 1330) systems of 25 kW or below are approved by the DISCO directly instead.

The first version of the regulations moved existing net-metering customers onto the new billing too. After a public outcry and a draft amendment in February, SRO 547(I)/2026 rewrote regulation 21(2): an agreement executed before 9 February 2026 keeps the rate and the mechanism of the 2015 regulations until its term expires. The saving ends if the facility is materially modified so that its maximum output changes.

What the export rate is

The regulations name it, the national average energy purchase price, and say NEPRA may revise it by notification mid-agreement (reg. 14(3)). They do not state a figure, and we could not find a NEPRA notification that does. What exists is NEPRA's own CY2026 power purchase price: an energy charge of Rs 924 billion for the year, which is Rs 8.13 per unit bought from generators or Rs 9.12 per unit sold to consumers. Dawn and most of the press report "about Rs 10 to 11". The old net metering paid surplus at the off-peak rate, reported at about Rs 26.

So the calculator lets you pick. Rs 8.13 is the default because it is the only figure with a NEPRA document behind it, and it is what the solar sizer and payback pages use too; Rs 11 is the figure in circulation. On the default month the gap between them is PKR 1,435.

How the old net metering is worked out here

Regulation 14 of the 2015 regulations nets the units. If you imported more than you exported, the net units are billed at the applicable tariff, so the slab is set by the net figure, not by the gross. If you exported more, the surplus is carried to the next billing cycle, and at the end of each quarter anything left is paid at the off-peak rate for your category, with no fixed charges, FCA or levies on it. Fixed charges and the TV fee on your own bill still apply, which is why a surplus month is not zero.

What this tool cannot know

Sources: NEPRA (Prosumer) Regulations, 2026 — S.R.O. 251(I)/2026, 9 February 2026 · S.R.O. 547(I)/2026 — amendment grandfathering pre-9 February agreements (K-Electric copy, dated 2 April 2026) · Business Recorder: Nepra ensures existing net metering rates to continue · Business Recorder: small-scale prosumers exempted from Nepra approval · NEPRA decision on the Federal Government motion, CY2026 uniform tariff · Dawn: Nepra pulls the plug on net-metering · NEPRA Net Metering Regulations, 2015 — S.R.O. 892(I)/2015 (K-Electric copy) · S.R.O. 279(I)/2026, 12 February 2026 — residential tariff used for the import charge · K-Electric: Net Billing (new connections)

Common questions

I import 400 units and export 500. What do I pay under net billing?

With the default export rate of Rs 8.13, about PKR 17,032 on a 5 kW connection. The 400 imported units are billed like any other bill, PKR 21,097 with taxes, and the 500 exported units earn a credit of PKR 4,065. Under the old net metering the same month nets to 100 surplus units, so you pay only the fixed charges and TV fee, PKR 1,658, and carry 100 units forward.

Who is still on the old net metering?

Anyone whose agreement with the DISCO was executed before 9 February 2026. SRO 547(I)/2026 rewrote regulation 21(2) so those agreements keep the rate and the mechanism of the 2015 regulations until their term runs out, as long as the system is not materially modified. Adding panels or a bigger inverter, so the maximum output changes, ends the protection.

What is the export rate, exactly?

The regulations say exports are credited at the "national average energy purchase price" and leave the figure to NEPRA. NEPRA's CY2026 power purchase price puts the energy charge at Rs 8.13 per unit bought and Rs 9.12 per unit sold; the press reports about Rs 10 to 11. We found no notification that fixes the prosumer figure, so you pick it. The default is Rs 8.13, the one with a NEPRA document behind it; at the reported Rs 11 the default month costs PKR 15,597 rather than PKR 17,032.

Does exporting a lot more than I import give me a cheque?

Only a small one. Export 900 and import 300 on net billing and the credit is PKR 7,317 against an import bill of PKR 14,919, so the DISCO owes you PKR 7,602, credited to next month or paid quarterly. Under the old rules that month is 600 surplus units carried forward, worth about PKR 15,600 if paid out at the reported Rs 26 at the quarter's end.

What does it cost to get on net billing?

A one-time concurrence fee of Rs 1,000 per kW to NEPRA (Schedule-IV), so PKR 5,000 for 5 kW and PKR 10,000 for 10 kW, plus the bidirectional meter and any interconnection work, which the prosumer pays for. Since the August 2026 amendment, systems of 25 kW or below are approved by the DISCO directly rather than by NEPRA. The agreement runs 5 years and renews 5 years at a time.